VPCC supports investors across the full life cycle of a seaport: investment studies, permitting, survey and design, project management, construction, technology and equipment, operations and digital transformation.

About VPCCSince 2009, VPCC has stood alongside investors across the whole journey of a port, from the investment idea, permitting and design survey to construction and operation. We put quality first, work with a strong sense of responsibility for schedule and post-handover warranty, and draw on an advisory board of professors and doctors from technical universities. With engineers we invest in for the long term and care for the coastal environment, VPCC is committed to delivering ports that are safe, efficient and sustainable.
- 16+
- Years of experience
- 100+
- Consulting, design and survey contracts
- 40+
- Construction contracts
- 85
- Engineers, staff and skilled workers
One continuous chain, from investment idea to operations
The eight steps of a port project’s life cycle and the VPCC service group behind each.
- Investment studyOpportunity, site, scale, phasing, financial viability.
- PermittingInvestment approval, land, sea area, environment, construction.
- Survey and designTopographic, geotechnical and metocean surveys; design and verification.
- Project managementQuality, schedule and cost management; coordination of all project parties.
- ConstructionSupervision, construction and EPC.
- Technology and equipmentHandling technology, cranes, conveyors, storage.
- OperationsProcedures, berth and yard layout, dispatching, productivity.
- Digital and AIMonitoring, process digitisation, operations data.
Once a port is operating, VPCC keeps supporting adjustment, upgrading, expansion and digitisation.
Featured projects

Song Lam International Port
Terminal Area 1 has seven berths over 1,144 m; Terminal Area 2 has two berths over 300 m for vessels up to 100,000 DWT. VPCC has been involved from design and construction to port declaration and AI camera advisory.

Hon La International General Port
EPC contractor for Hon La International General Port, with a 1,030 m quay for vessels up to 100,000 DWT.

Nghi Son Iron and Steel International General Port
Six berths totalling 1,497 m for vessels from 20,000 to 100,000 DWT; VPCC provided design and supervision consulting and built several components.

Coal Import Port and Breakwater – Quang Trach Power Centre
A 300 m quay for vessels up to 100,000 DWT; VPCC supports management of the EPC contract for the coal port and breakwater.

Van Phong International Port – Phase 1
Two berths totalling 184 m for vessels up to 100,000 DWT, built by VPCC under an E&C arrangement.

Vinh Tan General Port
Three berths totalling 550 m for vessels from 3,000 to 30,000 DWT on 141.2 ha.
Capabilities, experience and strengths
Contracts delivered
106 consulting, survey and design contracts and 41 construction contracts since 2009.
Class I certification
Topographic and geotechnical survey; port and waterway design and construction; port and inland-waterway supervision (Ministry of Construction, valid until 28 Sep 2027).
One team across the life cycle
From investment files and port declaration to design and EPC, the investor works with one team that already knows the project.
Staff and advisory board
Engineers, staff and workers supported by an advisory board of professors and doctors from leading technical universities.
In-house survey and construction
Own offshore geotechnical drilling platform, echo sounders, GNSS and UAV, plus pile hammers, cranes and excavators.
Technology, port equipment and smart port
Port technology and equipment
Choosing handling technology, cranes, conveyors and storage; analysing throughput, capital and operating cost and equipment life cycle; optimising existing ports.
Learn moreSmart port and AI
Live project: an AI camera cargo-monitoring system at Song Lam International Port, where VPCC is consultant to the port owner.
Learn moreClients and partners
Talk to us about your port project
Tell us the type of port, its location and the project stage. VPCC will reply with a suggested way to work together.